Select Page

All Our Domestic Upgrade Reports

Here some of the homes we have surveyed in Ireland during our energy audits for EMPs. Use this is a guide to how your homecould benefit from upgrades: making it cozier, saving you money, adding to its value and reducing your carbon footprint

Detached 1983

Total Building Area (m2): 82
Current Condition D2
Post Works A3
Cost Savings €3,351
Cabon Saved (tree equivalent) 413
Est Cost of Works  nett grant. €31,100
Payback in years 9.3
Report Summary LINK >>

Mid Terrace, 1919

Total Building Area (m2): 130
Current Condition E1
Post Works A3
Cost Savings €6,532
Cabon Saved (tree equivalent) 764
Est Cost of Works  nett grant. €34,100
Payback in years 5.2
Report Summary LINK >>

Semi Detached, 1980

Total Building Area (m2): 89
Current Condition E2
Post Works A3
Cost Savings €4,818
Cabon Saved (tree equivalent) 562
Est Cost of Works  nett grant. €40,300
Payback in years 8.4
Report Summary LINK >>

Semi Detached, 1980

Total Building Area (m2): 89
Current Condition D1
Post Works B1
Cost Savings €2,745
Cabon Saved (tree equivalent) 360
Est Cost of Works  nett grant. €15,800
Payback in years 5.8
Report Summary LINK >>

Detached, 985

Total Building Area (m2): 180
Current Condition C1
Post Works A3
Cost Savings €3,497
Cabon Saved (tree equivalent) 490
Est Cost of Works  nett grant. €23,300
Payback in years 6.7
Report Summary LINK >>

Semi-Detached, 1996

Total Building Area (m2): 83
Current Condition C3
Post Works A3
Cost Savings €3,497
Cabon Saved (tree equivalent) 490
Est Cost of Works  nett grant. €23,300
Payback in years 6.7
Report Summary LINK >>

Detached, 1950

Total Building Area (m2): 207
Current Condition B2
Post Works A3
Cost Savings €2,214
Cabon Saved (tree equivalent) 370
Est Cost of Works  nett grant. €13,600
Payback in years 6.1
Report Summary LINK >>

Mid Terrace, 1900

Total Building Area (m2): 115
Current Condition E2
Post Works A3
Cost Savings €6,131
Cabon Saved (tree equivalent) 707
Est Cost of Works  nett grant. €28,100
Payback in years 4.6
Report Summary LINK >>

Mid Terrace 1919

Total Building Area (m2): 60
Current Condition E2
Post Works B1
Cost Savings €3,046
Cabon Saved (tree equivalent) 369
Est Cost of Works  nett grant. €27,300
Payback in years 9.0
Report Summary LINK >>

Semi Detached, 2004

Total Building Area (m2): 112
Current Condition B3
Post Works A3
Cost Savings €2,010
Cabon Saved (tree equivalent) 273
Est Cost of Works  nett grant. €13,600
Payback in years 6.8
Report Summary LINK >>

Semi-Detached, 1977

Total Building Area (m2): 112
Current Condition E1
Post Works A3
Cost Savings €3,583
Cabon Saved (tree equivalent) 536
Est Cost of Works  nett grant. €36,700
Payback in years 10.2
Report Summary LINK >>

Detached, 1950

Total Building Area (m2): 104
Current Condition D2
Post Works B1
Cost Savings €1,231
Cabon Saved (tree equivalent) 243
Est Cost of Works  nett grant. €41,700
Payback in years 14.8
Report Summary LINK >>

Detached, 1999

Total Building Area (m2): 184
Current Condition C1
Post Works A3
Cost Savings €2,415
Cabon Saved (tree equivalent) 400
Est Cost of Works  nett grant. €41,900
Payback in years 17.3
Report Summary LINK >>

Mid Terrace 1920

Total Building Area (m2): 89
Current Condition D2
Post Works B1
Cost Savings €2,211
Cabon Saved (tree equivalent) 400
Est Cost of Works  nett grant. €32,700
Payback in years 14.8
Report Summary LINK >>

Detached, 1906

Total Building Area (m2): 65
Current Condition E2
Post Works B2
Cost Savings €2,026
Cabon Saved (tree equivalent) 321
Est Cost of Works  nett grant. €39,700
Payback in years 19.6
Report Summary LINK >>

Semi-Detached, 1996

Total Building Area (m2): 106
Current Condition C2
Post Works A3
Cost Savings €2,026
Cabon Saved (tree equivalent) 321
Est Cost of Works  nett grant. €39,700
Payback in years 19.6
Report Summary LINK >>

Mid Terrace, 1910

Total Building Area (m2): 137
Current Condition G
Post Works B1
Cost Savings €7,379
Cabon Saved (tree equivalent) 1,479
Est Cost of Works  nett grant. €32,700
Payback in years 4.4
Report Summary LINK >>

Semi-Detached, 2001

Total Building Area (m2): 103
Current Condition C2
Post Works A3
Cost Savings €1,711
Cabon Saved (tree equivalent) 243
Est Cost of Works  nett grant. €41,000
Payback in years 22.8
Report Summary LINK >>

Mid-Terrace, 1890

Total Building Area (m2): 174.2
Current Condition D1
Post Works B1
Energy Cost Savings €3,275.70
Cabon Saved (tree equivalent) 724
Est Cost of Works  nett grant. €35,092
Payback in years 10.7
Report Summary LINK >>

Detached, 2003

Total Building Area (m2): 181
Current Condition B3
Post Works A3
Energy Cost Savings €1,241.81
Cabon Saved (tree equivalent) 399
Est Cost of Works  nett grant. €35,092
Payback in years 28.3
Report Summary LINK >>

Semi Detached, 1984

Total Building   Area (m2): 249
Current Condition B2
Post Works B1  
Energy Cost Savings €862.95
Cabon Saved (tree equivalent) 239
Est Cost of Works  nett grant. €25,992
Payback in years 30.1
Report Summary LINK >>

End of Terrace, 1900

Total Building Area (m2): 200
Current Condition E2
Post Works B1
Energy Cost Savings €5,782.87
Cabon Saved (tree equivalent) 1,026
Est Cost of Works  nett grant. €38,092
Payback in years 6.6
Report Summary LINK >>

Detached pre 1977

Total Building Area (m2): 128.6
Current Condition D2
Post Works B2
Energy Cost Savings €2,090.12
Cabon Saved (tree equivalent) 484
Est Cost of Works  nett grant. €39,100
Payback in years 18.7
Report Summary LINK >>

Semi-Detached,1996

Total Building Area (m2): 107
Current Condition C3
Post Works A3
Energy Cost Savings €1,795.90
Cabon Saved (tree equivalent) 379
Est Cost of Works  nett grant. €35,092
Payback in years 19.5
Report Summary LINK >>

Detached, 2006

Total Building Area (m2): 249
Current Condition B3
Post Works A3
Energy Cost Savings €1,989.54
Cabon Saved (tree equivalent) 607
Est Cost of Works  nett grant. €29,992
Payback in years 15.1
Report Summary LINK >>

Detached, 2001

Total Building Area (m2): 193
Current Condition C1
Post Works A3
Energy Cost Savings €2,640.05
Cabon Saved (tree equivalent) 569
Est Cost of Works  nett grant. €35,092
Payback in years 13.3
Report Summary LINK >>

Detached, 2010

Total Building Area (m2): 260.8
Current Condition B2
Dwelling Post Works A2
Energy Cost Savings €2,539.32
Cabon Saved (tree equivalent) 492
Est Cost of Works  nett grant. €18,300
Payback in years 7.2
Report Summary LINK >>

Detatched, built 2003

Total Building Area (m2): 163.4
Current Condition C3
Post Works A3
Energy Cost Savings €2,815.33
Cabon Saved (tree equivalent) 555
Est Cost of Works  nett grant. €35,092
Payback in years 12.5
Report Summary LINK >>

What Supports are there for you to start your home future-proofing journey?

Fully Funded Upgrade

Qualifying* homeowners receiving certain welfare benefits: All home upgrade costs covered by SEAI

Service is managed by SEAI and includes:

  • home survey
  • contractor selection
  • contractor works 100% funded
  • follow up BER

Homes built and occupied before 2006

*Receiving one of:

  • Fuel Allowance
  • Job Seekers Allowance
  • Working Family Payment
  • One-Parent Family Payment
  • Domiciliary Care Allowance
  • Carers Allowance
  • Disability Allowance

 

One Stop Shop Service

Based on set grants per measure, this can be grant funded by SEAI 45 – 50% of the cost for a typical family home

 One Stop Shop contractor manages upgrade including:

  • home energy assessment
  • grant application
  • project management
  • upgrade to a minimum B2 BER
  • contractor works
  • homeowner pays for the works net of grant
  • follow up BER

For homes built and occupied before:

  • 2011 for insulation and heating controls
  • 2011 for renewable systems

 

Individual Energy Upgrade Grants

Up to 80% of the cost of the upgrade for a typical family home with SEAI grants

Homeowners manage their own upgrades including:

  • contractor selection
  • grant application
  • contractor works
  • pay for full cost of works and claim grants afterwards
  • follow up BER

 For homes built and occupied before:

  • 2011 for insulation and heating controls
  • 2021 for heat pumps and renewable system

 

 

 

Typical costs of home improvements and the grants available to make them affordable

Individual actions for homeowners

…some quick and easy sustainability ‘wins’ to save you energy and money as well as reducing carbon emissions

Step 1: Do Your Own Audit:

  • Check windows, external doors, vents, floor spaces, fireplaces, and stoves with a stick of incense: and track down and eliminate draughts.
  • Check insulation levels in attic, basement, walls (including the meter box), and floors
  • Check your boiler and stove; what age are they? When were they last serviced?
  • Collect energy bills and scrutinise them over a year.
  • To save money in the short term see if you need to change your electricity supplier.

Step 2: Actions to save 12% of your energy costs and fossil fuel use:

  • Turn everything off – don’t leave on standby (2%)
  • Use a clothes line when possible – no tumble dryer (7%)
  • Wash clothes @ 30 degrees (1%)
  • Turn off lights when not in a room, replace bulbs with highest rated LEDs possible (A+ read the lables not all LEDs are the same) – change as they go so as to spread the cost (2%).

Step 3: Save energy by thinking about the way you control and use heat

  • Maintain room temperature 190C (this can save up to €350 every year for each degree lower you heat the house)
  • Close the curtains at dusk to keep heat in the room that would otherwise be lost through the cold windows, and you could save up to 10% of your heating costs.
  • Consider fitting shelves above radiators as they redirect the warm air that rises from them back into the room.
  • Ventilate your house 3 to 5 minutes, a couple of times a day, instead of opening windows a little bit all day. Shut off your heating, during ventilation. This can reduce heat loss by 16%.
  • Bleed your radiators regularly. If there is air in your radiator your boiler burns longer. Always start with the lowest and end with the highest radiator.